
Purchased parts installation on
slide frame.
Slide frame before welding,
blasted to accept paint.

Base frame: channels welded in
place, holes drilled & tapped; blasted &
painted; assembly in progress.

Gear box and mounting bracket assembled.
|
96" Cable Winder
Fabricated,
Machined & Assembled: mid March - April 2001
All parts
fabricated and/or machined in-house.
(Electric and hydraulic components purchased
or customer supplied as required.)
Control box & bearing mounts.

Control box & bearing mounts
before assembly.

Slide frame and base assembled
with puchased parts.
|