Fabrication completed; included, rolling
side plates,
oxy-fuel & plasma cutting numerous shapes,
fitting and
welding at dimensions to accommodate machining.![](shop_picts/weld/casing_tank/CasingTank_Inside.jpg)
Inside view.
![](shop_picts/weld/casing_tank/Casing_Tank_mach_back.jpg)
Casing tank after drilling and
milling
on Mazak machining center.
|
Pump
Casing Tank
Fabricated,
Machined & Assembled: mid April 2001
All parts
fabricated and/or machined in-house. ![](shop_picts/weld/casing_tank/CasingTnk_Back_Blasted.jpg)
Tank blasted before machining.
Ready for loading on Mazak maching center.
![](shop_picts/weld/casing_tank/CasingTnk_Side_Blasted.jpg)
![](shop_picts/weld/casing_tank/Casing_Tank_mach_front.jpg)
Other side of casing tank after drilling